img
img
img
img
img
link
Home / all-journals/ /Article

Monitoring of the Time and Action Calendar of a T-shirt Manufacturing


Faruq Hosen1*, Rezaul Karim1, Rokibul Islam1, Jabir Hossain Babu1, Nahidul Islam1, Razib Hasan1, and SM Abdul Matin1


1Department of Textile Engineering, Sonargaon University, Dhaka, Bangladesh. 

*Correspondence: texfaruq@gmail.com (Faruq Hosen, Lecturer, Department of Textile Engineering, Sonargaon University, Dhaka, Bangladesh).

Powered by Froala Editor


ABSTRACT

This study was calculated to investigate the time and action (TNA) plan of a T-shirt manufacturing. A time and action calendar determine the final date/time in which the main activities of an order should be against a scheduled distribution window. To ensure timely supply within a specific delivery date of buyers in the knit garments industry, Time and Action Calendar or TNA, a popular tool that is used for tracking and following up in preproduction processes. The acquaintance about the TNA plan will also help to organize the production time-efficient manner that is better production on lead time from buyers. Creating a TNA The calendar doesn't just flow the name and duration of the activity; It’s also about technically The duration of the activity works, understandably determining the foregoing and subsequent activities. TNA is the table of activities of specific order and Process flow Sort by the table of tasks that require to be finished. The two key important dates are the cut-off date (PCD) and the ex-factory date as per the TNA plan. TNA largely turned on the order, the prerequisites of the machine, and the specific approach flow of available yield capacity. TNA plan is measured by the time frame which is related to buyers' lead time to export a particular order. The TNA obtained by taking it the requisition of 8101 pieces of a basic t-shirt, made out of 95% cotton and 5% elastane 160 GSM single jersey fabrics. The order is for SS 2019 and the buyer is GAP, delivery date October 8, 2019, and shipment at New York, USA. 


Keywords: TNA plan, T-shirt, Manufacturing, Calendar, GSM, Production, Monitoring, and Knit garments.


Citation:  Hosen F, Karim R, Islam R, Babu JH, Islam N, Hasan R, and Matin SMA. (2020). Monitoring of the time and action calendar of a T-shirt manufacturing, Aust. J. Eng. Innov. Technol., 2(6), 101-105. 

https://doi.org/10.34104/ajeit.020.01010105


Powered by Froala Editor